healup

Track every bite
with a snap.

Point your camera at any meal and get instant calories, macros, and nutrition insights — powered by AI. No typing, no guessing.

<15s
Scan time
50+
Nutrients tracked
3-day
Free trial

Free 3-day trial · Premium from $4.17/mo · Cancel anytime

Healup home dashboard
AI-powered by GPT-4o vision
Privacy-first · no data sold
Works with Apple Health & Google Fit

Everything you need to eat smarter

Healup combines AI, nutrition science, and beautiful design so that staying healthy feels effortless.

AI Food Scanner

Point your camera, snap a photo. Healup identifies your food and returns full nutrition data in under 15 seconds — no typing required.

Complete Macro Tracking

Track protein, carbs, fat, fiber, sugar, and sodium. Daily progress rings and weekly charts make hitting your goals intuitive.

Exercise & Calorie Burn

Log workouts, track steps from Apple Health or Google Fit, and see your true net calories after burn — all on one screen.

Hydration Tracking

Set a daily water goal and hit it with quick-add buttons. A week-view bar chart shows your hydration at a glance.

90-Day Progress Insights

7, 30, and 90-day charts for calories, macros, weight, and nutrients. See trends, spot patterns, and understand what's working.

AI Nutrition Coach

Your personal AI coach reviews your meals, suggests what to eat next, flags nutritional gaps, and celebrates your wins daily.

From snap to insight
in three steps.

1

Point your camera

Open the app and tap the scan button. Frame your meal — plate, bowl, snack, anything. Healup handles the rest.

2

Get instant nutrition data

Our AI identifies the food and estimates the portion. You see calories, protein, carbs, fat and more — in under 15 seconds.

3

Track, analyse, improve

Meals are logged automatically. Daily summaries, 90-day charts, and your AI coach help you understand your patterns and reach your goals.

AI food scanner
Meal log

Barcode scanner

Scan any packaged food barcode and get full nutrition facts instantly from our global food database.

Nutrient quality scores

Healup flags high sugar, sodium, and low fibre — not just calories — so you build genuinely healthy habits.

Streak & achievements

Daily streaks, milestone badges, and achievement unlocks keep you motivated and on track every day.

Beautifully designed, inside and out

Clean, warm, and distraction-free. Built to be used daily without feeling like a chore.

Home dashboard
Dashboard
Meal log
Meal Log
Progress charts
Progress

Common questions

Everything you need to know before you start.

How accurate is the AI food scanner?

Healup's AI uses GPT-4o vision to identify food and estimate portions. Typical accuracy is within 10–30% of actual values, depending on portion visibility and food complexity. We always recommend treating results as smart estimates, not clinical measurements.

What happens to my food photos?

Photos are resized on your device to 1,024px before upload, processed by our AI, and automatically deleted from our servers within 7 days. We never use your photos for advertising or share them with third parties beyond the AI processing step.

Does Healup work with Apple Health and Google Fit?

Yes. With your permission, Healup reads steps and active energy burn from Apple Health (iOS) or Google Health Connect (Android) to calculate your net calories for the day.

Can I cancel my subscription anytime?

Absolutely. Subscriptions are managed directly by Apple or Google — you can cancel from your device settings at any time. There are no penalties or hidden charges. Your Premium access continues until the end of the current billing period.

Is Healup a medical or dietary prescription app?

No. Healup is a general wellness tool. It does not provide medical advice, diagnose conditions, or replace a registered dietitian or physician. Always consult a qualified healthcare professional before making significant changes to your diet or exercise routine.

What's included in the 3-day free trial?

You get full Premium access — unlimited AI scans, AI coach, 90-day charts, workout plans, and everything else — completely free for 3 days. No credit card is charged until the trial ends, and you can cancel before it does.

Still have questions? Contact us

One plan. Everything included.

Try free for 3 days — no credit card required. Then pick your billing cycle.

Healup Premium
$4.17/month

billed $49.99/year

BEST VALUESave 48% vs monthly
Try Free on App StoreTry Free on Google Play

No charge today · Cancel anytime

Everything included

  • Unlimited AI food scans
    Snap any meal — instant macros
  • Personalised AI nutrition coach
    Answers based on your real data
  • 90-day insights & trends
    See exactly what's working
  • Full workout plan
    Built for your goal and fitness level
  • Custom diet plan
    Meals matched to your preferences

Subscriptions managed by Apple App Store & Google Play. Cancel anytime.

healup

Start your health journey today.

Free 3-day trial. No credit card required. Start tracking in under 2 minutes.

Healup is not a medical device. Nutritional estimates are approximate. Read disclaimer →